Packaging and Containers
We select materials and production methods, manufacture packaging to your design, and inspect samples before the production run.
What’s Included
How We Work
- 1
Review the design, dimensions, and requirements
- 2
Select the materials and factory
- 3
Produce a sample
- 4
Approve the sample and launch the production run
- 5
Inspect and dispatch the batch
Key Benefits
A broad choice of materials and production methods
Custom design
Custom branding
Minimum order quantity from 1,000 units
Frequently Asked Questions
How much does shipping from China cost?
The cost depends on the type, volume, and weight of the cargo, as well as the shipping method. Each shipment is quoted individually based on your requirements.
What are the delivery lead times?
Transit time depends on the supplier’s location and the delivery address. Typical transit times are 5–12 days by air, 20–25 days by road, 25–35 days by sea, and 25–35 days by rail.
Do you work with small production runs?
Yes. The minimum production order starts at 500 units per SKU.
How do you control quality?
We first document the requirements in the technical specification. We can then inspect raw materials and components before production, perform in-process quality control, and conduct a final pre-shipment inspection. The inspection scope is agreed in advance, and we provide photo and video reports.
Other Services
Supplier and Factory Sourcing
We identify manufacturers that match your technical specification and verify their registration, production capabilities, and commercial terms.
Product Procurement
We arrange purchases from Chinese manufacturers, oversee payment, check order completeness, and coordinate handover to logistics.
Apparel, Footwear, and Bag Manufacturing
We develop samples and oversee the manufacture of apparel, footwear, bags, and accessories to the approved specification.
Let’s Discuss Your Requirements
Within 48 hours, we’ll clarify the initial details and recommend the next step.
Submit a Request