SIBERCORP
All Services

Equipment, Spare Parts, and Production Lines

We source equipment and components, verify specifications, and oversee production, packaging, and dispatch.

What’s Included

Sourcing of equipment and spare-parts manufacturers
Verification of technical specifications
Agreement on the equipment configuration
Manufacturing and packaging oversight
Preparation for transportation
Delivery to your production site

How We Work

  1. 1

    Review the technical specification

  2. 2

    Source and compare suitable options

  3. 3

    Agree on the final specification

  4. 4

    Monitor production readiness

  5. 5

    Arrange dispatch and delivery

Key Benefits

Technical specifications verified before the order is placed

Oversight of heavy-duty and oversized packaging

One coordinated process for equipment and spare parts

Frequently Asked Questions

How much does shipping from China cost?

The cost depends on the type, volume, and weight of the cargo, as well as the shipping method. Each shipment is quoted individually based on your requirements.

What are the delivery lead times?

Transit time depends on the supplier’s location and the delivery address. Typical transit times are 5–12 days by air, 20–25 days by road, 25–35 days by sea, and 25–35 days by rail.

Do you work with small production runs?

Yes. The minimum production order starts at 500 units per SKU.

How do you control quality?

We first document the requirements in the technical specification. We can then inspect raw materials and components before production, perform in-process quality control, and conduct a final pre-shipment inspection. The inspection scope is agreed in advance, and we provide photo and video reports.

Let’s Discuss Your Requirements

Within 48 hours, we’ll clarify the initial details and recommend the next step.

Submit a Request